Vitebsk Unitary Municipal Production Enterprise kotelnyhi heat networks "military-industrial complex and TC"

pellet boilers

During 2017 year, the company started production of boilers for the installation of the burners,designed for burning wood pellets (pellets).

The first pellet boilers production of the State Enterprise "VPKiTS" power of 95kW installed in the boiler room "Bath №4".

Wait for your offers.Republic of Belarus, 210021, g. Vitebsk, st. Titova, 121 "BUT"wire. 63-92-38, Fax 66-32-14, is-mail: marketingvpkits@yandex.ru

Estimated cost for the products of the State Enterprise "VPKiTS"
product name The selling price per unit without VAT, rub. VAT per unit of output, rub. The selling price per unit with VAT, rub.
1 Condensing heat exchanger KTG-0,1 73 746,36 14 749,27 88 495,63
2 Condensing heat exchanger KTG-0,2 154 071,62 30 814,32 184 885,94
3 TK heat exchanger-0,2 104 183,66 20 836,73 125 020,39
4 TK heat exchanger-0,4 137 827,56 27 565,51 165 393,07
5 TK heat exchanger-0,6 177 031,62 35 406,32 212 437,94
6 TK heat exchanger-0,8 216 218,11 43 243,62 259 461,73
7 Boiler KV-DG-0,095-95 12 672,46 2 534,49 15 206,95
8 Boiler KV-DG-0,075-95 12 598,05 2 519,61 15 117,66
9 Boiler KV-DG-0,045-95 12 017,47 2 403,49 14 420,96
10 Bunker for pellets 843,30 168,66 1 011,96
11 Automated, modular transportable boiler room heat output up 0,2 MW on pellets like UKAMT 192 545,05 38 509,01 231 054,06
12 Cupboard heater SHTP-1 (with CO and a two-stage scheme for DHW heat) 34 608,72 6 921,74 41 530,46
13 Cupboard heater SHTP-2 (with CO and hot water heating circuit in parallel) 35 462,52 7 092,50 42 555,02
14 Cupboard heater SHTP-3 (only with CO) 23 853,00 4 770,60 28 623,60
Note:
1. Prices are formed on ex-warehouse enterprise manufacturer.
2. Specifications TU BY 300149357.007-2018 "Paragraphs individual heating Cabinet freestanding SHTP" provide power from CO 0,013 to 0,08 Gcal / hour, DHW - from 0,01 to 0,04 Gcal / hour.
3. Selling prices for Cabinet heating units SHTP may vary on an individual basis according to customer requirements, depending on the required design power CO and DHW.
4. Selling prices for heat exchangers can be changed individually according to the customer's requirements, depending on the need to include additional equipment.
5. When the products of the State Enterprise are included "VPKiTS", in the cost of the building, financed in whole or in part at the expense of the republican and (or) local budgets, their cost is recalculated taking into account the requirements of the Decree of the Ministry of Architecture and Construction of the Republic of Belarus dated 12 July 2022. №69 "On the procedure for price regulation"

offers:

  • Production of boilers, heating up 3,15 MW, using solid fuel (firewood, torfobriket) and natural gas officials. № 02300/0232675

designation of the boiler

dimensions, not more than mm

Weight, not more than kg

Heat output-voditelnost, MW (Gcal / hour)

Fuel consumption, max

Water flow rate m³ / h

The volume of water in the boiler m³

kg / Gcal

kg / Gcal

m³ / Gcal

Length

Shiri-on

Height

firewood

peat-briquette

Natural gas

KB-AG-0,8-95

3500

2000

2500

4000

0,8 (0,688)

520

300

-

27,5

1,0

KB-AG-0,4-95

2500

1700

2000

2500

0,4 (0,344)

520

300

-

13,7

0,6

KB-AG-0,065-95

1200

650

1220

600

0,065 (0,056)

27,7

16,1

-

2,24

0,25

KB-AG-0,04-95

1000

630

1150

400

0,04 (0,0344)

17

9,9

-

1,4

0,16

KV-GM-1,1-95

3600

1400

2600

4800

1,1 (0,946)

-

-

138

37,7

3,01

HF-GM-0,8-95

2900

1300

2300

3500

0,8 (0,688)

-

-

138

27,4

1,4

HF-GM-0,4-95

2500

1000

2000

2000

0,4 (0,344)

-

-

138

13,7

1,02

Note: On request boilers they are equipped with a cyclone, control, download and blowing devices.

  • Maintenance and repair of control devices, regulation and metering of water, thermal and electric energy. grudge. № 56-49 by 01.06.04g.

  • metrological certification (verification) flow meters and heat meters (ultrasound, electromagnetic, variable differential pressure, vane and turbine).

grudge. № 56-49 by 01.06.04g.

  • Diagnosis of steam and hot water boilers, quality control of the weld and the base metal connectors NDT methods.

persons. № 02300/0232675

  • Drain and storing fuel oil.

  • Hydro flushing and hydraulic testing of internal systems of heating buildings and water heaters.

  • By operation flow in heating systems and water supply portable device Portaflow-MK-II-R.

  • REPAIRS:

  • valves of all types;

  • Pump Type K, KM, D, NC, CNSG and others.;

  • steam- and vodovodyanyh heaters;

  • MANUFACTURING:

  • elevator units;

  • metal products and structures (racking, workbenches, cabinets for overalls, urns, litter boxes, sand, etc., fences) the customer's request.

 

1. The batch production of condensing heat exchanger TK

Condensing heat exchanger type TC-02 - TC-0,8 set for boilers

working on chips with power from 1000 to 4000 kW and are designed to produce

additional heat (10-20 %) due to utilization of heat of flue gases.

Condensing heat exchanger manufactured according to specifications

TU BY 300149357.005-2016 and in compliance with technical regulations

TR TS 010/2011.

Registration number of the declaration of conformity: TS number RU D - BY.AL16.V.62060.

2. Embedded prototypes and preparing for mass production of boilers

Automatic combustion Pillet:

KB-AG-0,045-95

KB-AG-0,075-95

KB-AG-0,095-95

according to specifications TU BY 300149357.006-2017