Vitebsk Unitary Municipal Production Enterprise kotelnyhi heat networks "military-industrial complex and TC"
pellet boilers
During 2017 year, the company started production of boilers for the installation of the burners,designed for burning wood pellets (pellets).
The first pellet boilers production of the State Enterprise "VPKiTS" power of 95kW installed in the boiler room "Bath №4".
Wait for your offers.Republic of Belarus, 210021, g. Vitebsk, st. Titova, 121 "BUT"wire. 63-92-38, Fax 66-32-14, is-mail: marketingvpkits@yandex.ru
Estimated cost for the products of the State Enterprise "VPKiTS" | ||||
№ | product name | The selling price per unit without VAT, rub. | VAT per unit of output, rub. | The selling price per unit with VAT, rub. |
1 | Condensing heat exchanger KTG-0,1 | 73 746,36 | 14 749,27 | 88 495,63 |
2 | Condensing heat exchanger KTG-0,2 | 154 071,62 | 30 814,32 | 184 885,94 |
3 | TK heat exchanger-0,2 | 104 183,66 | 20 836,73 | 125 020,39 |
4 | TK heat exchanger-0,4 | 137 827,56 | 27 565,51 | 165 393,07 |
5 | TK heat exchanger-0,6 | 177 031,62 | 35 406,32 | 212 437,94 |
6 | TK heat exchanger-0,8 | 216 218,11 | 43 243,62 | 259 461,73 |
7 | Boiler KV-DG-0,095-95 | 12 672,46 | 2 534,49 | 15 206,95 |
8 | Boiler KV-DG-0,075-95 | 12 598,05 | 2 519,61 | 15 117,66 |
9 | Boiler KV-DG-0,045-95 | 12 017,47 | 2 403,49 | 14 420,96 |
10 | Bunker for pellets | 843,30 | 168,66 | 1 011,96 |
11 | Automated, modular transportable boiler room heat output up 0,2 MW on pellets like UKAMT | 192 545,05 | 38 509,01 | 231 054,06 |
12 | Cupboard heater SHTP-1 (with CO and a two-stage scheme for DHW heat) | 34 608,72 | 6 921,74 | 41 530,46 |
13 | Cupboard heater SHTP-2 (with CO and hot water heating circuit in parallel) | 35 462,52 | 7 092,50 | 42 555,02 |
14 | Cupboard heater SHTP-3 (only with CO) | 23 853,00 | 4 770,60 | 28 623,60 |
Note: 1. Prices are formed on ex-warehouse enterprise manufacturer. 2. Specifications TU BY 300149357.007-2018 "Paragraphs individual heating Cabinet freestanding SHTP" provide power from CO 0,013 to 0,08 Gcal / hour, DHW - from 0,01 to 0,04 Gcal / hour. 3. Selling prices for Cabinet heating units SHTP may vary on an individual basis according to customer requirements, depending on the required design power CO and DHW. 4. Selling prices for heat exchangers can be changed individually according to the customer's requirements, depending on the need to include additional equipment. 5. When the products of the State Enterprise are included "VPKiTS", in the cost of the building, financed in whole or in part at the expense of the republican and (or) local budgets, their cost is recalculated taking into account the requirements of the Decree of the Ministry of Architecture and Construction of the Republic of Belarus dated 12 July 2022. №69 "On the procedure for price regulation" |
offers:
-
Production of boilers, heating up 3,15 MW, using solid fuel (firewood, torfobriket) and natural gas officials. № 02300/0232675
designation of the boiler |
dimensions, not more than mm |
Weight, not more than kg |
Heat output-voditelnost, MW (Gcal / hour) |
Fuel consumption, max |
Water flow rate m³ / h |
The volume of water in the boiler m³ |
||||
kg / Gcal |
kg / Gcal |
m³ / Gcal |
||||||||
Length |
Shiri-on |
Height |
firewood |
peat-briquette |
Natural gas |
|||||
KB-AG-0,8-95 |
3500 |
2000 |
2500 |
4000 |
0,8 (0,688) |
520 |
300 |
- |
27,5 |
1,0 |
KB-AG-0,4-95 |
2500 |
1700 |
2000 |
2500 |
0,4 (0,344) |
520 |
300 |
- |
13,7 |
0,6 |
KB-AG-0,065-95 |
1200 |
650 |
1220 |
600 |
0,065 (0,056) |
27,7 |
16,1 |
- |
2,24 |
0,25 |
KB-AG-0,04-95 |
1000 |
630 |
1150 |
400 |
0,04 (0,0344) |
17 |
9,9 |
- |
1,4 |
0,16 |
KV-GM-1,1-95 |
3600 |
1400 |
2600 |
4800 |
1,1 (0,946) |
- |
- |
138 |
37,7 |
3,01 |
HF-GM-0,8-95 |
2900 |
1300 |
2300 |
3500 |
0,8 (0,688) |
- |
- |
138 |
27,4 |
1,4 |
HF-GM-0,4-95 |
2500 |
1000 |
2000 |
2000 |
0,4 (0,344) |
- |
- |
138 |
13,7 |
1,02 |
Note: On request boilers they are equipped with a cyclone, control, download and blowing devices.
-
Maintenance and repair of control devices, regulation and metering of water, thermal and electric energy. grudge. № 56-49 by 01.06.04g.
-
metrological certification (verification) flow meters and heat meters (ultrasound, electromagnetic, variable differential pressure, vane and turbine).
grudge. № 56-49 by 01.06.04g.
-
Diagnosis of steam and hot water boilers, quality control of the weld and the base metal connectors NDT methods.
persons. № 02300/0232675
-
Drain and storing fuel oil.
-
Hydro flushing and hydraulic testing of internal systems of heating buildings and water heaters.
-
By operation flow in heating systems and water supply portable device Portaflow-MK-II-R.
-
REPAIRS:
-
valves of all types;
-
Pump Type K, KM, D, NC, CNSG and others.;
-
steam- and vodovodyanyh heaters;
-
MANUFACTURING:
-
elevator units;
-
metal products and structures (racking, workbenches, cabinets for overalls, urns, litter boxes, sand, etc., fences) the customer's request.
1. The batch production of condensing heat exchanger TK
Condensing heat exchanger type TC-02 - TC-0,8 set for boilers
working on chips with power from 1000 to 4000 kW and are designed to produce
additional heat (10-20 %) due to utilization of heat of flue gases.
Condensing heat exchanger manufactured according to specifications
TU BY 300149357.005-2016 and in compliance with technical regulations
TR TS 010/2011.
Registration number of the declaration of conformity: TS number RU D - BY.AL16.V.62060.
2. Embedded prototypes and preparing for mass production of boilers
Automatic combustion Pillet:
KB-AG-0,045-95
KB-AG-0,075-95
KB-AG-0,095-95
according to specifications TU BY 300149357.006-2017